Saturday, August 8, 2009

Road closed

We’ve found many revealing things about our house by trying to renovate a couple of rooms (more than we ever wanted to know, to tell the truth.)  Even though we didn’t plan on doing all this stuff, it’s good to get things taken care of. 

Here we have the road closed off just for us so they can put in a new sewer line.  The old one was made of clay and had several breaks in it and it it was partly disconnected out in the street.  

  IMG_6926IMG_6893

That hole by our house is over 7 feet deep.  Here’s one of the backhoes they used to dig up the street.

 IMG_6917  IMG_6921

Here’s the dumpster that has become a permanent fixture in our driveway.  They’ve already dumped it 3 times.  Ian has the quite the formidable crowbar skills.

 IMG_6919IMG_6884

Here is our gutted basement family room.  Arden pulled off an amazing bit of engineering to raise the height of the downstairs entrance.

IMG_6881 IMG_6949

One of the surprises after we pulled down all the ceiling tiles were the 6 structurally unsound joists.  Here’s 2 that they had notched to put in some lights.  Here’s one they cut into for a heating duct that has started to split.

IMG_6944 IMG_6945

Here is one of 2 joists that someone inexplicably cut straight up into, and then decided they better patch them with some 2x4’s.

 IMG_6946 

We are glad to have them fixed before our floor caves in.  What a relief!

1 comment:

Salena Ashton said...

I especially like that yellow and orange flowered wall paper behind the mickey mouse job on the joists. We're happy that things are coming along in your home!