Sunday, August 9, 2009

We’ve been framed!

Progress on the house has been coming along nicely.  Scott and Neil have been working hard, Arden has been doing the more skilled labor, the engineering and generally keeping everything on track and Lorraine has logistics under control.

All of the windows are in, demolition is complete and the walls have all been framed.  These two upstairs bedroom had paneling that was just glued on to the walls.

IMG_6965IMG_6963

The bedrooms are now framed and ready for the electrical, insulation, and drywall.

  IMG_6974 IMG_6977

The basement is now all framed with all the windows in.  We should hopefully get most of the electrical done this week, and maybe all of the plumbing (keep your fingers crossed!)

IMG_6985 IMG_6988

The window wells outside turned out really nicely.  Scott did a great job grading the soil so it slopes away from the house. 

IMG_6996 IMG_6997

We have a new outside yard hydrant that hooks up to the main water line.  Our plants are still doing OK, despite not being able to water them every day. 

IMG_6998  IMG_6992

Yeah for fresh grown tomatoes!

IMG_7001